Fleet Graphics Bid Comparison Worksheet
A fleet graphics bid comparison worksheet helps a buyer compare actual proposals against the same project request. It is useful when different descriptions, vehicle counts or included tasks make the lowest visible total difficult to interpret. The finished record connects each proposal revision with the real units, artwork assumptions, work boundaries and unresolved questions. It gives the decision maker a traceable comparison to discuss with the providers. Use the commercial procurement checklist for the broader buying process, and use this worksheet for the narrower task of making the submitted offers comparable.

Original fictional commercial planning concept; not a completed customer installation.
Freeze the brief being compared
Identify the actual request sent to the providers and give it a dated revision reference. Retain the vehicle list, current photographs, requested coverage, supplied brand files and timing constraints with that request. If one provider received a later attachment, record the difference before treating the proposals as responses to the same brief. A comparison needs a stable starting point that another buyer can retrieve.
Write the comparison boundary in one sentence. For example, an illustrative request might concern graphics for two specified service vans, with a separate trailer excluded from that round. The actual record must use your real quantities and vehicles. Keep prospective additions in a separate question. Mixing a possible future vehicle into one provider’s response can create an apparent price difference that is really a different quantity of work.
Identify the proposal versions and actual unit instances
Record each provider’s actual proposal reference, issue date and revision. Link the received document rather than copy a total into a sheet without its source. Check that the vehicle descriptions refer to the actual instances in your request. Two vehicles with the same model name can still have different doors, equipment or requested graphic areas that affect the proposed work.
Give each unit a business reference and connect it with the relevant proposal line. If a proposal describes a quantity without identifying the covered units, ask which units that quantity includes. Keep the response beside the comparison. A useful row might read unit A, requested side and rear areas, provider response reference pending. It should not imply that an unspecified line has already been confirmed for every vehicle in the fleet.
Compare the work that each response actually includes
Create comparison rows for the tasks material to your request: artwork preparation, proof revisions described in the response, proposed graphic areas, production, installation coordination and any separately discussed removal or preparation work. Use the provider’s actual wording and reference. Mark a task included, excluded or awaiting clarification only where the source supports that status.
Keep the comparison descriptive. A larger printed area or a different proposed graphics system is a scope difference requiring review, not automatic evidence that one offer is better. Where the buyer needs a particular result, describe the actual requirement and ask how the response addresses it. This makes the discussion specific enough for a provider to clarify the work rather than answer a general request to match another total.
Separate exclusions from missing information
An explicit exclusion is different from a task that a proposal does not mention. Record the exact source for an exclusion and use an open question for silence. The scope exclusions checklist can carry a detailed boundary review; link its current reference here so the bid comparison does not develop a second conflicting set of exclusions.
Identify which unresolved differences could change the buying decision. A missing removal description may matter if the actual units already have graphics, while a possible future vehicle may belong outside the current comparison. Assign a question owner and request a written clarification tied to the affected proposal revision. Do not quietly fill a blank with an assumption borrowed from another provider’s response or from an earlier project.
Ask bounded clarification questions
Send questions that identify the proposal, unit and task in question. Instead of asking whether everything is included, ask whether the listed response covers the actual rear-door area shown in the current photographs, or which supplied artwork revision the proposal assumes. Keep the questions concise enough for a provider to answer against its own response.
Record the received answer and whether it changes the comparison. If the provider issues a revised proposal, make that revision the active source and retain the earlier document as history. A verbal discussion can identify a useful question, but the comparison should identify the actual confirmation the buyer relies on. Keep unresolved items visible until the responsible source responds or the buyer deliberately changes the requested scope.
Document the buyer's decision and its basis
Identify the person or business role making the selection and the current source package reviewed. Record the reasons that actually informed the decision, such as a confirmed scope match, a resolved unit question or a coordination requirement addressed in the response. Keep facts, preferences and unanswered questions distinguishable. This worksheet does not supply a provider rating or establish the meaning of an agreement.
Check the chosen proposal against any purchase-order or scope record used by the business. If the decision changes the requested work, identify that change before downstream artwork or scheduling assumes a different package. A useful completed comparison lets a second coordinator identify which response was selected and why, without reconstructing the choice from old attachments with similar filenames.
Turn the comparison into a usable project handoff
Download the working record with the brief reference, proposal revisions, actual unit mapping, work comparison, clarification status and decision owner. Retain the source documents through the business’s normal process. Keep sensitive commercial information in the appropriate business record and share only the details needed for the next participant’s task.
For a Pelican Wraps project review, send the actual vehicles or surfaces, current views, quantities, approved brand files, requested coverage and relevant constraints. Identify the bounded scope questions you need answered. A comparison is useful when it produces a clearer request and a traceable selection, not when it turns uncertain assumptions into a numerical score. Continue to the selected scope and proof process using the current documents.
Draft and Download Your Working Record
Draft your entry, then download a copy before leaving. Send any project decision through the communication process agreed with your supplier.
Frequently Asked Questions
Take the Next Step with a Clear Project Brief
Continue with the resource that matches your next decision:
- Fleet Graphics Procurement & RFQ Checklist
- Fleet Graphics Management
- Fleet Graphics Scope Exclusions Checklist
- Fleet Graphics Purchase Order Scope Checklist
- Request a Quote
Send the actual vehicle or surface photographs, quantities, approved brand files, requested coverage and timing constraints. Identify open questions so the project review can address your equipment and business needs.

